Tuesday, January 11, 2011

Paneling Complete

SANYO DIGITAL CAMERA

I have been up to the land for three days of work so far this month, and that was enough time to finish paneling the inside. Above is a shot of the finished loft.



This shot shows the trim around the doors. In keeping with the rustic appearance, I went pretty basic with any trim. I simply cut down pieces of paneling, as I did for the trim around the windows.



I used some scrap panels to make shelves in the bathroom. The divider wall to the kitchen is only paneled on the kitchen side, leaving the bathroom side with the studs exposed. I installed the scrap pieces in the space between two studs. This should provide plenty of storage space for toilet paper and the composting medium for the composting toilet.



Here is the composting toilet. I have unpacked it, but not installed it yet.




I also has some time to do other little things around the place. I installed the cabinets for the kitchen. Behind the shabin, I set up a small shed to house the electrical systems, which include the generator, inverter, and storage batteries. There will be more on that in my next post. Finishing the electrical system is my next project.

Tuesday, December 21, 2010

Paneling Begins

SANYO DIGITAL CAMERA


I made the trek up to the Shabin again last weekend. This follows a couple of inches of snow we received earlier in the week. I was the first vehicle to travel down our shared private road. The road to our land is 2 miles of ups and downs and hairpin turns. In other words, it was a nail biter.



This was especially true considering the 1500 lbs of wood paneling I was carrying in the back of my truck. At least all that weight kept the rear tires well stuck to the ground. I did not spin the wheels once! For paneling, I am using 5 1/8" wide rustic New England white pine flooring. Flooring for wall? Yes, and I will explain why. The only difference between unfinished pine flooring and unfinished pine paneling is the thickness. Paneling is typically 0.3" and flooring is 0.75" thick. Thicker is better! It feels more substantial when you lean on it, and you can nail a picture right to it. On top of that, flooring costs about the same or less than paneling per square foot.  I believe that is because pine flooring is a widely used product with a decent market, while pine paneling has become a niche product.



The best thing I did to prepare was to buy a pneumatic nailer. This is saving me, because paneling take a huge number of nails and this makes it effortless. I am using this inexpensive Hitachi Brad Nailer and it is has been working great.






The planks are tongue and groove, and I am blind nailing them, meaning that I nail into the tongue part and the groove of the next plank. So, I start at the bottom of the walls and work my way up.



The work is pretty fast for plain walls, but going around obstacles such as outlets and windows slows things down a lot. Much measuring, cutting, and trimming is required. I did luck out on my first outlet. Notice that the top of the lower plank landed just right so that I only had to cut an opening in the one plank above. None of the other outlets were so cooperative.



I am keeping to a rustic look, and I want to avoid putting up much molding. For trimming around the windows, I simply trimmed down some scrap planks and nailed them around the opening.



Here is a finished wall. I had been debating how to finish the wood, and I was leaning towards shellac. However, I recently saw this fantastic cabin featured in Dwell. I think it my the most perfect tiny cabin I have seen.  Its interior is unfinished New England white pine.That settled it for me, and I am leaving the wood unfinished to age as it will. I can get away with things looking rustic here, and it is certainly the cheapest and least effort approach.



This is the frist time I had been to the land in the snow. It is quite pretty and the shabin is very cozy.

After two days and 16 hours of work, I almost finished the downstairs area. I believe the downstairs will end up being harder than upstairs, due to all the windows, outlets, and divider walls. This pace is not has fast as I had hoped for, but not as bad as a feared. I am optimistic that I will finish the paneling during the next two day trip.

Wednesday, December 8, 2010

Insulation for Fun and Survival





I ventured up to the shabin this past weekend. The weather was crisp and clear, with the temperature ranging from a high of 32F to something in the 20s overnight. One nice thing about this time of year is that the views get better once the leaves have fallen. I arrived Saturday morning and inside the cabin it was about 40F. I fired up the little heater and got to work finishing the insulation. At the end of the last trip I put up some batts in the walls, just the easy ones I did not need to cut, and had not yet insulated the ceiling. The heater was only able to get the temperature up to about 55F.  If I was going to sleep comfortably that night, I needed to get to work!



I wanted to get the ceiling insulated first, so the first thing I did was to install vents within the rafters. These seem to be made out of the same foam material in which Big Macs used to be packaged. They create an space so that air can flow under the roof from the vents in the eaves up to the peak of the roof. Without that air flow, moisture can be trapped in the space, and moisture ruins the insulation.



Once the vents were stapled in place, then I could start insulating. The insulation in the walls is held in by friction, but the insulation in the ceiling must be stapled to the rafters. This was by far the most arduous part of the process, and it was dark outside before I was done.  However, as soon as all the ceiling insulation was in place, the temperature of the shabin began to rise dramatically. I then spent the rest of the evening finishing the wall insulation and stuffing insulation into all the little nooks and funny shaped spaces.

Photo & Video Sharing by SmugMug

Morning came with ominous dark clouds moving over head, with occasional snow flakes. During the night, there were high winds and some freezing cold misting rain. However, it was warm and quiet inside the shabin. It eventually got so warm, almost 70F downstairs and 75F up in the loft, that I had to strip the blanket off the bed in the middle of the night. I continued working Sunday morning, framing in the walls for the toilet closet and shower area. The kerosene heater ran out of fuel without me noticing, and I worked inside for 3 hours without the inside temperature dropping noticeably. With the insulation and framing work complete, I am now ready to start on paneling the interior. I have ordered 700 square feet of unfinished white pine, so I expect my next post will show some progress on paneling.

Tuesday, November 23, 2010

Lights! Heat! Bats!



After a two-month hiatus, I made it back up to the shabin last weekend to do some more work. After opening all the shutters, I uncovered this cute pair of sleeping critters. I would have expected them to take off right away, but one of them opened its eyes and watched me, before flying away after I was out of sight. The other kept sleeping for a couple of hours before disappearing. I will apologize for the quality of my photographs. I forgot to bring a real camera and had to use my iPod touch instead.



It is getting colder, with temperatures below 40 degrees at night, so I now need heat. I eventually plan to install a vented propane heater. My cheap stop gap so that I can keep working through this winter is this kerosene space heater. It did an admirable job heating the uninsulated cabin all night using very little fuel. It is a bit stinky and requires cracking a window to supply it fresh air, so it is not a permanent solution. It did give me some idea that insulating the cabin will mean we can get by with quite a small heater.



I finished the electrical work I started back in September, meaning I wired in one last outlet, lights for the kitchen area, and this ceiling fan. The fan is out in the open vaulted part of the shabin, and did a great job circulating the heated air around the building. The fan was rescued from our house, which is now undergoing a major renovation.



Also rescued from the house were the cabinets I installed for my mud room project previously posted in this blog. I believe I will be able to use all of the cabinets to create the shabin's kitchen as well as general storage for stuff in the living area. I spent much of my time moving the cabinets from the truck into the shabin, and then reorganizing the piles of tools, hardware, and other stuff that had collected around the shabin into the cabinets.  As space is a premium, this was necessary, despite having simply set the cabinets temporarily on the floor.  Once I have the interior insulated an paneled, then I can start hanging cabinets on the wall.



And, speaking of insulation, I also brought up all the insulation and started work on installing it. I found a relatively new product that is not made with fiberglass. As anyone who has installed fiberglass insulation would know, the old stuff is very itchy and it take days for any glass fibers to work their way out of one's skin. This stuff feels like cotton and is a joy to work with. It is otherwise identical to fiberglass in its insulating properties and installation method. Because the shabin was conventionally framed with 2x4's that are 16 inches apart on center, I am able to just press the insulation batts into the voids between studs.

This was just a quick trip up at mid-day Saturday and returning mid-day Sunday, but I fell like I got a good deal of work done. My next trip will be to finish the insulation and, hopefully, get started paneling the interior.

Thursday, September 23, 2010

Shabin Electrical Part 1

As mentioned in the last post, I was able to spend an entire weekend working on the shabin. I got enough done to warrant two posts. After finishing the loft railings, I got to work wiring the shabin for electric. My original plan was to wire the cabin for 12 volt DC power. The shabin will be off-grid, so the idea was to store power in large batteries, much like an RV.  As I got closer to actually doing the electrics, I switched to 110 volt AC. Technically, 12V power is more efficient for battery power, since the electricity is not converted. However, there are significant drawbacks. Because of the lower voltage, the current, measured in amperes, is higher. The higher current also larger energy loss over distance, which is dissipated as heat, not a good thing.  To alleviate that requires thicker and more expensive wiring.  Additionally, 12v fixtures, form switches to light bulbs, are specialized and more expensive. Finally, there is very little literature available on the best ways to wire 12v.

On the other hand, AC power is ubiquitous and all the necessary parts are cheap and plentiful commodities, and the knowledge on proper techniques is common and freely available.  AC is much more appropriate for moving power over longer distances than DC, which requires thicker and thicker wire as the distance increases. Therefore, AC allows me to move the batteries outside of the cabin.  The approach I took was to treat the shabin as one big AC appliance that I plug in. So, I ended up going with common household AC wiring



And here is the plug. This was the only unusual component I used, a 15-amp 110v AC inlet (inlet being the opposite of outlet, of course.) This was the one item I needed to order online. With this approach, I am free to use any power source, generator/solar/wind/grid, as long as it is converted to AC and has a power cord.



The rest of the electrics are standard, starting with the breaker box, which is where the power flows to first  from the inlet. I have done home wiring in the past, but this is the first time I had wired a breaker box. It was a bit daunting, but I read up on it and it turned out to be easy.  Typically, the most dangerous thing about the breaker box is the always-on high power line coming in from the grid. In my case, I was assuredly safe as long as I did not plug in the inlet while I worked.



Victory!  This was the first outlet I wired.  It is just below the breaker box. I plugged my gas generator into the inlet, and the circuit tester plugged in to the outlet lit up just as it should. That was a good feeling.



That good feeling was tempered when I nicked my finger with a knife shortly after this success. This would not be notable, expect that I forgot to pack the first aid kit. Lacking real band aids, I had to kludge together a paper towel and duct tape.



I continued to wire the rest of the cabin on Sunday. Since I want to insulate the walls, I ran the wires on the inside edge of the framing members.  This is done by snapping a two chalk lines one inch apart along all the studs of a wall.



I used my circular saw to cut 1/2 inch deep grooves at each chalk mark, and then used a chisel to create a notch in each stud. The wire is run and secured in the notches.



The wires are protected from penetration from future nails or screws which metal plates.



By the time I left on Sunday, I had wired in all the outlets, the bathroom light, and the loft lights as shown above. I had to stop when I ran out of wiring, so on the next trip I can finish the minor remaining tasks of wiring the kitchen overhead light and the living area ceiling fan.

Shabin Loft Railing

SANYO DIGITAL CAMERA

I went up to the shabin this past weekend by myself, while Lizz entertained an out of town guest. This afforded me two full days of work, and much was accomplished. The first thing I did Saturday morning was to finish the cable railings for the loft. As shown above, there are two railings.  Twelve cables run the width of the loft and protect the opening to the living area below.



Since the stairs run up through an opening in the loft floor, I wanted to prevent accidental falls into the stair well. For that, I ran cables perpendicular to the ceiling, which is set at 45 degrees. The cables also have the effect of eliminating the bounce originally present along the open end of the loft.



Here is the view down the stairs.  I think the railings turned out quite snazzy.

Sunday, September 5, 2010

Loft Railing

We made a quick day trip up to the camp yesterday. The main purpose of the trip was to deliver our new sleeper sofa. When I designed the shabin, I used an IKEA sofa as a reference for the living area furniture. I assumed we would buy the Ektorp corner sofa with a pull out bed. A corner sofa would provide the maximum amount of seating in a small area. A pull out bed would give us the second sleeping area we needed. Given the small proportions of the shabin, and the tight tolerances for things like loft stairs, the exact size of the sofa became critical. I was quite dismayed when I recently went to order the sofa and learned it had been discontinued.

Photo & Video Sharing by SmugMug

Craigslist came through, however. I found this beauty for sale less than a mile from home, and it only ran me $100. The left side pulls out into a full size bed, and the right side is an ultra comfortable chaise lounge. Lizz claims it is the most comfortable piece of furniture we own. The sofa is in pretty good condition. The fabric is a bit faded but sturdy and the pattern is not something we would not have chosen for ourselves. In other words, it is perfect for a cabin in the woods.



Here we see the tight tolerance between the couch and the loft stairs. While we were up there, I also started on safety railings for the loft. I decided to use steel cables for the railings. Cables would be strong and the least obtrusive with regards to light and air movement. I also figured that they would look pretty cool. I purchased most of the materials from E-Rigging, who I will say were extremely quick fulfilling my order and much cheaper than buying from Lowes.



The first step was to carefully measure all the mount points for the cables. That was a bit time consuming. Since everything up in the loft runs at an angle, I got to use my 9th grade geometry, go Pythagoras! I spaced the cables 3 1/2 inches apart, with the top cable 42 inches above the loft floor. For the cable mount points, I used #0 size lag screws with eyes as shown in the picture.



In order to maintain tension in the cables, I used large (3/8") turnbuckles rated at 2000 lbs. These have shackles on one end whose bolts are slipped through the lag screw eyes.



I used 1/8" uncoated steel cable rated at 2000 lbs. Each cable is looped through the eye end of a turnbuckle, and secured with two screw down clips.  The other end is secured in the same way on the matching eye screw. Once secured, the cable is tightened by adjusting the turnbuckle. I used galvanized steel for all the hardware, which should be perfectly fine for interior use, and is a huge savings over using stainless steel.

Photo & Video Sharing by SmugMug

I think these are turning going to look great. This was just a quick day trip, so I did not have enough time to finish. I finished 8 of the 12 cables for the loft opening. I will also install a set of cables along the side of the stair opening to prevent falling in the hole from the other side.